Tunnel Design Team can provide a complete package of wastewater tunnels design and planning to preparation of tender documents and claim reports for contractors.
Our selected reference list is as below:
Project name and specification
|
Country |
Client |
Our Services |
Period |
Reference |
---|---|---|---|---|---|
|
|
|
|
|
|
Western Tehran Wastewater Tunnel TBM excavation, length 11 km, Final diameter 3.00 m, EPB-TBM |
IR |
Kayson Construction Company |
Preparation of tender documents and Volume estimation for an international bid financed by Islamic Development Bank
|
2013 |
Mr. Minaei Technical deputy |