Tunnel Design Team can provide a complete package of water conveyance tunnels design and planning to preparation of tender documents and claim reports for contractors.

Our selected reference list is as below:

 

Project name and specification

 

Country

Client

Our Services

Period

Reference

 

 

 

 

 

 

Water Transfer to Ghorveh Dehgolan Plain

(click on project name for more information)

Tunnel length 10.8 km and int. dia. 3.00 m by EPB TBM

IR

Aban Pazhouh Consulting Company

Complete package of Planning and detail design, including:

Geology, Engineering geology, hydrogeology studies (phase 2) considering TBM tunnelling

Method statement, TBM selection, preparation of TBM specifications

Segmental lining design (geometrical and structural design)

Design of site installation

Design of all technical services like transport, ventilation, drainage, water supply, compressed air

Face pressure calculations

Preparation of Risk Management Plan

Backfill grouting

Monitoring plan

Segment factory detail design

Ground treatment by foam

Project organization chart

Detailed time plan of design and construction

Waterproofing

HSP (Health and Safety Plan)

 

2013

Mr. Golshan

Managing director

Uma Oya Project in Sri Lanka (Headrace tunnel-15km by D.S.TBM)

(click on project name for more information)

 

Master plan consists 2 RCC dams, 3.7 km conveyance tunnel, 15.6 km headrace tunnel with internal dia. 3.5 m); surge and power shafts, caverns and 4 km tailrace by 2 D.S.TBMs and D&B

 

SR

Farab Company

Detail design, including

General method statement, TBM selection, preparation of TBM specifications

D&B method statement including blast hole arrangement, support, technical services

Design of site installation and site pavement and cradle for TBM installation in two portals

Trench design of portal (geometry and stability)

Engineering geology and geological hazards considering TBM tunnelling

Haulage system design

Disassembly detail design

Design of all technical services like transport, ventilation, drainage, water supply, compressed air

Segment factory: type selection and mould estimation

Backfill grouting

Monitoring plan

Preparation of detailed list of equipments and consumables

2012-13

Mr. Mostajer Haghighi

Head of Engeering dept.

Uma Oya Project in Sri Lanka (Conveyance tunnel-3.7km by D&B)

(click on project name for more information)

 

Master plan consists 2 RCC dams, 3.7 km conveyance tunnel, 15.6 km headrace tunnel with internal dia. 3.5 m); surge and power shafts, caverns and 4 km tailrace by 2 D.S.TBMs and D&B

 

SR

Farab Company

Preparation of D&B method statement

Design of blast-hole arrangement

Method of support installation

Design of technical services during execution; including:

• Ventilation

•Water supply

•Drainage

•Compressed air supply

Preparation of equipment list

Design of ground monitoring plan

2012-13

Mr. Mostajer Haghighi

Head of Engeering dept.

Uma Oya Project in Sri Lanka

Master plan consists 2 RCC dams, 3.7 km conveyance tunnel, 15.6 km headrace tunnel with internal dia. 3.5 m); surge and power shafts, caverns and 4 km tailrace by 2 D.S.TBMs and D&B

 

SR

Farab Company

Supervision on 1st phase and detail design of main consultant (JV of Poyry-Swiss and Mahab Ghodss-IRAN companies)

2011

Mr. Ahadi

Senior engineer

Chamshir Water Tunnel

(click on project name for more information)

 

TBM excavation, length 7.5 km, Final diameter 4.60 m, EPB-TBM

IR

Sabir Construction

Company

Detail design of segmental lining; including:

geometrical design (6+0) and

structural design by rebar and steel fiber

2013

Mr. Khosrotash

Project manager

West Water Tunnel (Lot 2);

Length 26km and Dia.6.7m

D.S.TBM

IR

Rahab Co.

Documentation of TBM procurement procedure

9 Volumes

2005-2006

Mr. Saadi

Technical deputy

Golab Water tunnel

Length 10km and final Dia.3.8m; D.S.TBM

 

IR

Scetiran Consulting Company

Complete package of Planning and detail design, including:

Geology, Engineering geology, hydrogeology studies (phase 2) considering TBM tunnelling

Method statement, TBM selection, preparation of TBM specifications

Segmental lining design (geometrical and structural design)

Design of site installation

Design of all technical services like transport, ventilation, drainage, water supply, compressed air

Backfill grouting

Monitoring plan

Segment factory conceptual design

Project organization chart

Detailed time plan of design and construction

Waterproofing

2005

Mr. Agha Amiri

Project manager

Aleppo Water Tunnel, Syria

Length 5 km and Dia. 5.5 m

S.S.TBM

 

SY

Sabir International Co.

Consulting in Procurement of an exiting Single Shield TBM AND Segment moulds – Design of a big open pit for opening of tunnel

 Design of site installation and arrangements

Preparation of site organization chart for TBM tunnelling

Complete design of segment factory

 

2005

Mr. Ebrahimi

Managing director

West Water Conveyance Tunnel- Lot 2

Length 26km and Dia.6.7m

D.S.TBM

IR

Imensazan Consulting

Design of  related structures to TBM start and commissioning

2004

Mr. Taheri

Project manager

Dam and Powerplant of Roodbar Lorestan

 

IR

Omran Inst.

Preparation of tender documents for underground works and access roads

2002

Mr. Moosavi

Project manager

Ghomroud Water Tunnel – Lot 3&4

length 24.5 km and final dia. 3.8m; D.S.TBM

IR

Imensazan Consulting

 

Report about review of hazards and problems

2003

Mr. Shamsi

Project manager