Tunnel Design Team can provide a complete package of water conveyance tunnels design and planning to preparation of tender documents and claim reports for contractors.
Our selected reference list is as below:
Project name and specification
|
Country |
Client |
Our Services |
Period |
Reference |
---|---|---|---|---|---|
|
|
|
|
|
|
Water Transfer to Ghorveh Dehgolan Plain (click on project name for more information) Tunnel length 10.8 km and int. dia. 3.00 m by EPB TBM |
IR |
Aban Pazhouh Consulting Company |
Complete package of Planning and detail design, including: Geology, Engineering geology, hydrogeology studies (phase 2) considering TBM tunnelling Method statement, TBM selection, preparation of TBM specifications Segmental lining design (geometrical and structural design) Design of site installation Design of all technical services like transport, ventilation, drainage, water supply, compressed air Face pressure calculations Preparation of Risk Management Plan Backfill grouting Monitoring plan Segment factory detail design Ground treatment by foam Project organization chart Detailed time plan of design and construction Waterproofing HSP (Health and Safety Plan)
|
2013 |
Mr. Golshan Managing director |
Uma Oya Project in Sri Lanka (Headrace tunnel-15km by D.S.TBM) (click on project name for more information)
Master plan consists 2 RCC dams, 3.7 km conveyance tunnel, 15.6 km headrace tunnel with internal dia. 3.5 m); surge and power shafts, caverns and 4 km tailrace by 2 D.S.TBMs and D&B
|
SR |
Farab Company |
Detail design, including General method statement, TBM selection, preparation of TBM specifications D&B method statement including blast hole arrangement, support, technical services Design of site installation and site pavement and cradle for TBM installation in two portals Trench design of portal (geometry and stability) Engineering geology and geological hazards considering TBM tunnelling Haulage system design Disassembly detail design Design of all technical services like transport, ventilation, drainage, water supply, compressed air Segment factory: type selection and mould estimation Backfill grouting Monitoring plan Preparation of detailed list of equipments and consumables |
2012-13 |
Mr. Mostajer Haghighi Head of Engeering dept. |
Uma Oya Project in Sri Lanka (Conveyance tunnel-3.7km by D&B) (click on project name for more information)
Master plan consists 2 RCC dams, 3.7 km conveyance tunnel, 15.6 km headrace tunnel with internal dia. 3.5 m); surge and power shafts, caverns and 4 km tailrace by 2 D.S.TBMs and D&B
|
SR |
Farab Company |
Preparation of D&B method statement Design of blast-hole arrangement Method of support installation Design of technical services during execution; including: • Ventilation •Water supply •Drainage •Compressed air supply Preparation of equipment list Design of ground monitoring plan |
2012-13 |
Mr. Mostajer Haghighi Head of Engeering dept. |
Uma Oya Project in Sri Lanka Master plan consists 2 RCC dams, 3.7 km conveyance tunnel, 15.6 km headrace tunnel with internal dia. 3.5 m); surge and power shafts, caverns and 4 km tailrace by 2 D.S.TBMs and D&B
|
SR |
Farab Company |
Supervision on 1st phase and detail design of main consultant (JV of Poyry-Swiss and Mahab Ghodss-IRAN companies) |
2011 |
Mr. Ahadi Senior engineer |
(click on project name for more information)
TBM excavation, length 7.5 km, Final diameter 4.60 m, EPB-TBM |
IR |
Sabir Construction Company |
Detail design of segmental lining; including: geometrical design (6+0) and structural design by rebar and steel fiber |
2013 |
Mr. Khosrotash Project manager |
West Water Tunnel (Lot 2); Length 26km and Dia.6.7m D.S.TBM |
IR |
Rahab Co. |
Documentation of TBM procurement procedure 9 Volumes |
2005-2006 |
Mr. Saadi Technical deputy |
Golab Water tunnel Length 10km and final Dia.3.8m; D.S.TBM
|
IR |
Scetiran Consulting Company |
Complete package of Planning and detail design, including: Geology, Engineering geology, hydrogeology studies (phase 2) considering TBM tunnelling Method statement, TBM selection, preparation of TBM specifications Segmental lining design (geometrical and structural design) Design of site installation Design of all technical services like transport, ventilation, drainage, water supply, compressed air Backfill grouting Monitoring plan Segment factory conceptual design Project organization chart Detailed time plan of design and construction Waterproofing |
2005 |
Mr. Agha Amiri Project manager |
Aleppo Water Tunnel, Syria Length 5 km and Dia. 5.5 m S.S.TBM
|
SY |
Sabir International Co. |
Consulting in Procurement of an exiting Single Shield TBM AND Segment moulds – Design of a big open pit for opening of tunnel Design of site installation and arrangements Preparation of site organization chart for TBM tunnelling Complete design of segment factory
|
2005 |
Mr. Ebrahimi Managing director |
West Water Conveyance Tunnel- Lot 2 Length 26km and Dia.6.7m D.S.TBM |
IR |
Imensazan Consulting |
Design of related structures to TBM start and commissioning |
2004 |
Mr. Taheri Project manager |
Dam and Powerplant of Roodbar Lorestan
|
IR |
Omran Inst. |
Preparation of tender documents for underground works and access roads |
2002 |
Mr. Moosavi Project manager |
Ghomroud Water Tunnel – Lot 3&4 length 24.5 km and final dia. 3.8m; D.S.TBM |
IR |
Imensazan Consulting
|
Report about review of hazards and problems |
2003 |
Mr. Shamsi Project manager |