Tunnel Design Team can provide a complete package of Motorway tunnels design and planning to preparation of tender documents and claim reports for contractors.
Our selected reference list is as below:
Project name and specification
|
Country |
Client |
Our Services |
Period |
Reference |
---|---|---|---|---|---|
|
|
|
|
|
|
Sayyad Roadway tunnel,Tehran TBM excavation, length 10 km, diameter 14.20 m, EPB-TBM |
IR |
Hendeseh Pars Consulting Engineers |
phase 1 design reports; including: Method statement, TBM selection, preparation of TBM specifications Segmental lining design (geometrical design) Preliminary design of start and exit TBM shafts |
2011 |
Mr. Hossein Nejad Project manager |
Tehran Shomal Freeway Project (Lot 2) twin motorway tunnels plus passages to service TU and main tunnels; D&B
|
IR |
Taloon construction company |
Preparation of tender technical documents in international tender Cost estimation |
2006 |
Mr. Rahimian Managing director |
Loashan Twin Roadway Tunnels each 250 m-Conventional Method |
IR |
FARBAR Consulting Engineers |
Complete Design of 1st & 2nd Phase |
2001 |
Mr. Akbar Project manager
|