Description مشاهده شده توسط Customers on Jan 6 Design Team Description رتبه:5.0

Metro

  • www.tunneldesignteam.com
    www.tunneldesignteam.com

Tunnel Design Team can provide a complete package of metro tunnels design and planning to preparation of tender documents and claim reprts for contractors.

Our selected reference list is as below:

 

Project name and specification

 

Country

Client

Our Services

Period

Reference

 

 

 

 

 

 

Qom metro Line A

TBM excavation, length 2×12 km, diameter 9.40 m, EPB-TBM

IR

SCE Inst.

First and second phase design of segment prodction plant (stationary type)

2012

Mr. Shamsi

Project director

Esfahan metro, Line 1: Middle section

twin tunnels with length of 4.5 km and final dia. 5.9 m, EPB TBM

IR

Alamoot Construction

Co.

Preparation of 4 reports on review of EPB TBMs abrasiveness problems in Esfahan metro – Line 1 : Middle Section (technical claim report);

2010

Mr. Masoudi

Managing Director

Esfahan metro, Line 1: South section

twin tunnels with length of 3.7 km and final dia. 6 and 8 m, Roadheader

IR

Alamoot Construction

Co.

Preparation of roadheader performance report and bit consumption in Esfahan metro – Line 1 (technical claim report);

2008

Mr. Masoudi

Managing Director

Tehran Metro Line 6 (Lots 1 and  2)

Tunnel length (12+18) km and int. dia. 8.15 m EBM TBM

IR

Taha Consulting Engineers

Preparation of tender technical documents

Cost estimation

2008

Mr. Nowjavan

Project manager

Tehran Metro Line 3

(Click on projet name for more information)

TBM excavation, length 7 km, diameter 9.20 m, EPB-TBM

IR

Rah-Tarh Consulting Co.

Complete package of Planning and detail design, including:

Method statement, TBM selection, preparation of TBM specifications

Segmental lining design (geometrical and structural design)

Design of site installation

Design of all technical services like transport, electricity, ventilation, drainage, water supply

Face pressure calculations

TBM passing through already-built station

Preparation of Risk Management Plan

Settlement prediction

Backfill grouting

Monitoring plan

TBM Entrance shaft

Segment factory

Site arrangement

 

2009-2010

Mr. Gharebaghi

Member of the board